

Operator wanted to install the tubing deeper into the curve of a horizontal well for an annular gas lift operation than they felt comfortable with while running a traditional packer or without a snubbing unit.
An Atlas Dissolvable Packer™ was installed by wireline at a depth of 11,030’ at 70° deviation and held 3000psi pressure from below. Once tubing was installed, the integral pump-out plug was expended right on the target pinning pressure allowing production to flow through the Atlas™ bore.
By placing the end-of-tubing deeper into the curve, the operator was able to increase drawdown and production by 11% vs. In addition to production improvements, the operator saved money by eliminating costly snubbing services.
Headquarters
716 W Avenue H, Rosenberg TX, 77471
Field Office
1308 S Midkiff Suite 214, Midland TX, 79701
Phone
+ 1 (346) 843-2174