Case History

Oklahoma Operator Eliminates Snubbing In Tubing with the Atlas Dissolvable Packer™

Time & Location

Q4 2021 – SCOOP/STACK Oklahoma

Well Conditions

BHT 250°F BHP 6,400 psi Freshwater

Challenge

Operator wanted to install the tubing deeper into the curve of a horizontal well for an annular gas lift operation than they felt comfortable with while running a traditional packer or without a snubbing unit.

Solution

An Atlas Dissolvable Packer™ was installed by wireline at a depth of 11,030’ at 70° deviation and held 3000psi pressure from below. Once tubing was installed, the integral pump-out plug was expended right on the target pinning pressure allowing production to flow through the Atlas™ bore.

Value

By placing the end-of-tubing deeper into the curve, the operator was able to increase drawdown and production by 11% vs. In addition to production improvements, the operator saved money by eliminating costly snubbing services.
See Full Product Details

Contact Us

If you are interested in our products or would like to know more details, please contact us by calling or leaving a message here.  We will respond as soon as possible.

Headquarters

716 W Avenue H, Rosenberg TX, 77471

Contact Form
Copyright © 2024 Shale Oil Tools, LLC. All Rights Reserved.
chevron-down